Geosynthetic Institute

 

GRI Guides

 

GC8 - Determination of the Allowable Flow Rate of a Drainage Geocomposite

·        Complete Written Text

·        Power Point Tutorial

GCL4 - Gripping of Reinforced GCLs to End Platens During Direct (Interface) Shear Testing

GCL 5 - Design Considerations for Geosynthetic Clay Liners (GCLs) in Various Applications

GM10 - The Stress Crack Resistance of HDPE Geomembrane Sheet (Procedure for NCTL Test)

GM14 - Selecting Variable Intervals for Taking Geomembrane Destructive Seam Samples Using the Method of Attributes

GM20 - Selecting Variable Intervals for Taking Geomembrane Destructive Seam Samples Using Control Charts

GN2 & GC13 - Joining and Attaching Geonets and Drainage Composites

GS3 - Selecting In-Situ Monitoring Methods and Devices for the Evaluation of Geosynthetic Performance

GS11 - Constructing Test Pads to Assess Protection Materials Intended to Avoid Geomembrane Puncture

GS12 - Lifetime Prediction of Geosynthetics Using Time-Temperature-Superposition (TTS) and Arrhenius Modeling

GS16 - Geosynthetic Sampling for Subsequent Laboratory Conformance Testing

GS26 - Attaching Foil Strain Gauges to Geosynthetics